Standard parts with exceptionally fast delivery
In many wire production facilities, the availability of replacement and wear parts determines how quickly equipment can be brought back online after maintenance or unplanned downtime. Especially for components that come into contact with the wire, such as pulleys or wire guides, short lead times are therefore a critical factor in ensuring equipment availability.
NABER & WISSMANN therefore keeps a wide range of standard components for wire drawing machines and wire production lines permanently in stock. This allows many products to be delivered significantly faster than if they were manufactured to order.
Stockpiling standard parts for maximum availability
A key component of our supply concept is the targeted pre-production of frequently used standard parts.
Thanks to decades of experience in the wire industry, we know which components are regularly needed in wire processing equipment. These parts are in constant demand in practice and are therefore continuously manufactured in advance.
This offers our customers a significant advantage: While many components in the wire industry are manufactured only after an order is received, NABER & WISSMANN already has numerous standard parts in stock.
This consistent inventory management enables exceptionally short lead times and ensures that customers often receive the components they need faster than they would from comparable suppliers.
- B.S. in Business Administration and Engineering (FH)
- Jens Teves-Humme
- Sales Manager & Authorized Signatory
- Senior Sales Manager
- +49 2331 689921
- jens.teves-humme@naber-wissmann.com
Benefits for maintenance and production
For maintenance departments and production managers, the rapid availability of standard parts means one thing above all else: shorter downtime.
When worn components need to be replaced on short notice, pre-manufactured stock items can be delivered quickly and put into service immediately. This allows maintenance work to be planned more efficiently and helps reduce unplanned production downtime.
Quality and reliability






